Skip to content. | Skip to navigation

Navigation

Personal tools
You are here: Home

Search results

2 items matching your search terms. Sort by relevance · date (newest first) · alphabetically
File Emergency Fire Precautions
Landowners and contractors will restrict operations in accordance with the attached Emergency Fire Precaution Schedule. This schedule is based on U. S. Forest service Industrial fire Plan Guidelines. Soil and Water Conservation Districts will evaluate projects in their districts and apply local USFS Restriction Levels as they deem appropriate. Projects adjacent to Forest Service lands will normally follow the local Forest District’s restrictions. Districts will communicate implementation and changes to these restrictions directly with the landowner or contractor, as appropriate. Contractors working projects on U. S. Forest Service or other agency lands must comply with the restrictions and procedures directed by that agency.
Located in Groups / / Project documents / Organizational documents
File Troff document 2015 Annual Report: Estancia Basin Watershed Health, Restoration and Monitoring Project
This 2015 Annual Report provides information on the results of forest thinning during the calendar year 2015. Initial 2008, 2009, and 2010 baseline pre-treatment monitoring data from permanent monitoring study sites provided information on rainfall, ambient and soil temperatures, soil moisture, soil surface profiles to assess erosion over time, soil surface stability, soil chemistry, bird and small mammal composition and relative abundance, and vegetation composition, structure, and cover. Monitoring data from 2011 to 2015 provides post treatment information on the above parameters along with data on medium-sized to large wildlife and livestock for the first 5 years following thinning treatments.
Located in Groups / / Monitoring / Annual Reports