Skip to content. | Skip to navigation

Navigation

Personal tools
You are here: Home / Library / Red River Total Maximum Daily Load (TMDL) Press Release

Red River Total Maximum Daily Load (TMDL) Press Release

The New Mexico Environment Department’s (NMED) Surface Water Quality Bureau (SWQB) is inviting the public to comment on the draft “total maximum daily load” (TMDL) withdrawal document for the Red River (Rio Grande to Placer Creek). A TMDL is a planning document that establishes specific goals to meet water quality standards in waterbodies where pollutant limits are exceeded.

PDF document icon RedRiverTMDL_PN10-19-2012.pdf — PDF document, 144 kB (148332 bytes)

Document Actions
Filed under:
Search for Content

On the Portal:

Advanced Search

On our Partner Search: